Replies: 1 comment 1 reply
-
@mcfongtw Is there any "prior art" to this idea? Do other metrics libraries support a concept of "Metric Levels" already? |
Beta Was this translation helpful? Give feedback.
1 reply
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Has there been any discussion about introducing a concept of Metric Level to each Metric instance?
Similar to log level in a logging framework, a metric level defines when a metric is needed. User can (statically / dynamically) enable / disable a metric according to the verbose level that is set in the reporter, i.e. the default level in reporter is set at INFO level and user can opt-in to DEBUG level if additional metric data is needed.
Beta Was this translation helpful? Give feedback.
All reactions