When I now open the Job Card for the last Operation, I can start the Job.
But when I try to Complete the Job, I get the message that there is another operation, that has to be complete before.
I expect this warning when I try to start the operation in the first place.
There is another error when I try to pause the job.
I get this message even when I added in a value for Completed Qty
Module
manufacturing
Version
Frappe Framework: v15.25.0
ERPNext: v15.21.2
Installation method
docker
Relevant log output / Stack trace / Full Error Message.
Job Card PO-JOB00006: As per the sequence of the operations in the work order MFG-WO-2024-00002, complete the operation Cutting before the operation Assembling.
Error: Job Card Time Log Row #1: Value missing for: Completed Qty
The text was updated successfully, but these errors were encountered:
Information about bug
I defined a routing with three BOM Operations.
When I now open the Job Card for the last Operation, I can start the Job.
But when I try to Complete the Job, I get the message that there is another operation, that has to be complete before.
I expect this warning when I try to start the operation in the first place.
There is another error when I try to pause the job.
I get this message even when I added in a value for Completed Qty
Module
manufacturing
Version
Frappe Framework: v15.25.0
ERPNext: v15.21.2
Installation method
docker
Relevant log output / Stack trace / Full Error Message.