You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I am a recent adopter of Ploomber and enjoying it. Thanks a lot for making this framework.
I am using grid in my pipeline.yaml and it works great. The only downside is that when visualizing the DAG with pipeline plot all nodes are included (and if there are enough nodes the html show nothing).
However, since nodes made by a grid step are related I would like them to appear as a single node in the DAG. Would it be possible to make an option for pipeline plot such that the user can choose whether or not to collapse grid nodes?
The text was updated successfully, but these errors were encountered:
Hi!
I am a recent adopter of Ploomber and enjoying it. Thanks a lot for making this framework.
I am using
grid
in mypipeline.yaml
and it works great. The only downside is that when visualizing the DAG withpipeline plot
all nodes are included (and if there are enough nodes the html show nothing).However, since nodes made by a grid step are related I would like them to appear as a single node in the DAG. Would it be possible to make an option for
pipeline plot
such that the user can choose whether or not to collapse grid nodes?The text was updated successfully, but these errors were encountered: