chore: bump to Bazel 7.1.2 #4395
ci.yaml
on: pull_request
matrix-prep-config
0s
matrix-prep-bazelversion
3s
matrix-prep-os
2s
Matrix: test
Annotations
8 errors and 2 warnings
test (rbe, 7.1.2, ubuntu-latest, 0, .)
Process completed with exit code 1.
|
test (rbe, 6.5.0, ubuntu-latest, 0, .)
Process completed with exit code 1.
|
test (rbe, 7.1.2, ubuntu-latest, 1, .)
Process completed with exit code 1.
|
test (rbe, 6.5.0, ubuntu-latest, 1, .)
Process completed with exit code 1.
|
test (local, 7.1.2, ubuntu-latest, 0, .)
Process completed with exit code 1.
|
test (local, 7.1.2, ubuntu-latest, 1, .)
Process completed with exit code 1.
|
test (local, 6.5.0, ubuntu-latest, 0, .)
Process completed with exit code 1.
|
test (local, 6.5.0, ubuntu-latest, 1, .)
Process completed with exit code 1.
|
test (local, 7.1.2, ubuntu-latest, 1, e2e/coreutils)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/0ad4b8fadaa221de15dcec353f45205ec38ea70b'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
test (local, 7.1.2, ubuntu-latest, 1, e2e/coreutils)
Back off 21.466 seconds before retry.
|