Skip to content

refactor(all): Update integration tests configuration #318

refactor(all): Update integration tests configuration

refactor(all): Update integration tests configuration #318

Triggered via pull request April 29, 2024 08:34
Status Failure
Total duration 1h 30m 19s
Artifacts
Dart Analyzer
1m 5s
Dart Analyzer
android_example_build
1m 2s
android_example_build
Matrix: android_integration_test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
android_integration_test (22)
0 tests passed, 1 failed.
android_integration_test (22)
The process '/bin/sh' failed with exit code 1
android_integration_test (34)
The job was canceled because "_22" failed.
android_integration_test (26)
The job was canceled because "_22" failed.
android_integration_test (26)
The operation was canceled.
android_integration_test (31)
The job was canceled because "_22" failed.
android_integration_test (31)
The operation was canceled.