Skip to content

deps(yauzl): upgrade to version 3.1.3 #1023

deps(yauzl): upgrade to version 3.1.3

deps(yauzl): upgrade to version 3.1.3 #1023

Triggered via push April 19, 2024 13:57
Status Failure
Total duration 37s
Artifacts

tests.yml

on: push
Matrix: tests
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (14.x)
Process completed with exit code 1.
tests (16.x)
The job was canceled because "_14_x" failed.
tests (16.x)
The operation was canceled.
tests (18.x)
The job was canceled because "_14_x" failed.
tests (18.x)
The operation was canceled.
tests (20.x)
The job was canceled because "_14_x" failed.
tests (20.x)
The operation was canceled.