Skip to content

Pull requests: openshift/release

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

[WIP] Observability-ui: Mirror an image built in the CI system out to an external registry do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51974 opened May 14, 2024 by zhuje Loading…
Nutanix capi enable
#51973 opened May 14, 2024 by sgaoshang Loading…
Debug case ocp-23583
#51972 opened May 14, 2024 by wewang58 Loading…
Automate config brancher by auto-config-brancher job at Tue, 14 May 2024 04:05:38 UTC approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged tide/merge-method-merge Denotes a PR that should use a standard merge by tide when it merges.
#51971 opened May 14, 2024 by openshift-bot Loading…
SDN-4776: add e2e-aws-ovn-subnet-configs jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51970 opened May 13, 2024 by jluhrsen Loading…
vsphere testing do not merge approved Indicates a PR has been approved by an approver from all required OWNERS files.
#51966 opened May 13, 2024 by jcpowermac Loading…
Ignoring broken image ocp/builder:rhel-8-golang-1.11 approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51965 opened May 13, 2024 by deepsm007 Loading…
ipi-gcp-manual-oidc to clean up credentials after cluster approved Indicates a PR has been approved by an approver from all required OWNERS files.
#51964 opened May 13, 2024 by jstuever Loading…
LCA 4.14/4.16/main branch update
#51963 opened May 13, 2024 by jc-rh Loading…
Update Tech Preview Periodics lgtm Indicates that a PR is ready to be merged.
#51962 opened May 13, 2024 by patrickdillon Loading…
Add testing of the Calico CNI
#51961 opened May 13, 2024 by mrbojangles3 Loading…
WIP:[MSINTEROP-993] Decouple OpenShift Pipelines installation and tests approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51960 opened May 13, 2024 by calebevans Loading…
horreum webhook integration
#51958 opened May 13, 2024 by shashank-boyapally Loading…
rhel9 building marketplace approved Indicates a PR has been approved by an approver from all required OWNERS files.
#51957 opened May 13, 2024 by grokspawn Loading…
OCPBUGS-33600: openshift-controller-manager: add hypershift conformance presubmit test jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51954 opened May 13, 2024 by sjenning Loading…
OSSM-4504 Add integration helm test run approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged.
#51953 opened May 13, 2024 by fjglira Loading…
Update installer shellcheck job trigger approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51952 opened May 13, 2024 by rwsu Loading…
OCPEDGE-1093: fix: adding retries for dnf installs approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#51951 opened May 13, 2024 by jeff-roche Loading…
Adding orion test approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#51950 opened May 13, 2024 by paigerube14 Loading…
[WIP] [NO-ISSUE] Attempt to fix assisted nutanix job do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#51949 opened May 13, 2024 by eliorerz Loading…
Updating CI buils with AMD Roc images needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#51945 opened May 13, 2024 by dibryant Loading…
CORS-3517: Add the GCP CAPI periodic test approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#51942 opened May 13, 2024 by barbacbd Loading…
CNF-10016: Mark ran latency performance as informing jobs do-not-merge/invalid-owners-file Indicates that a PR should not merge because it has an invalid OWNERS file in it. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#51940 opened May 13, 2024 by fontivan Draft
ProTip! Exclude everything labeled bug with -label:bug.